
User Application
GE LM6000 Aeroderivative Gas Turbine with MetalSCAN real-time condition indication sensors monitoring A, B, C, D, E and AGB-Sumps providing baseload power generation.
Conclusion
The operator was able to begin planning for the eventual engine shutdown and replacement at this very early stage, with an estimated 96 hours of forced outage avoided.